- Home
- Departments
- Community Development
Community Development
PERMIT CENTER CONTACT INFORMATION
Permit submittal email: permits@burlingtonwa.gov
Permit issuance and payment information: kimo@burlingtonwa.gov
Schedule an Inspection: bbuilding@burlingtonwa.gov or call 360-755-0077
Building and Floodplain Questions: robb@burlingtonwa.gov or craigc@burlingtonwa.gov 360-755-0077
Land Use Questions: bplanning@burlingtonwa.gov or mirandas@burlingtonwa.gov or bradmj@burlingtonwa.gov 360-755-9717
Fire Marshal Questions and Inspections: anniea@burlingtonwa.gov 360-757-6684
__________________________________________________________
Responsibilities
This is the location of a number of key services offered by the City of Burlington including the following:
- One-stop Permit Center for all land use, construction, and infrastructure permits
- Public Information on zoning, subdivisions, environmental review, critical areas, and a variety of related topics ranging from new commercial and residential construction to neighborhood questions about fences, garages, and pets
- Long range planning including updating Burlington’s Comprehensive Plans and Capital Improvement Plan
- Special areas of emphasis include downtown planning and coordination with the Downtown Burlington Association and implementing the Community Connections Plan
- Burlington’s Natural Hazard Mitigation Plan, base flood elevation information, and coordination of the Federal Emergency Management Agency’s Community Rating System program for Burlington.
_______________________________________________________
COMPREHENSIVE PLAN UPDATE - Adopted
The following revised code titles and maps will be effective Monday May 22, 2023:
BURLINGTON MUNICIPAL CODE: https://www.codepublishing.com/WA/Burlington/
Maps:
__________________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 3-26
- APPLICANT: Kevin Lisser, Lisser & Associates PLLC
- SITE: 810 Peterson Road, Burlington WA (P23619)
- Comment Period Deadline: March 11, 2026
The project proposes to divide a 0.59-acre lot into 2 residential lots. The property currently has a residential single-family home that will remain and a detached shop that will be demolished. No other development or site improvements are being made at this time. Click here Version Options Community Development Headline Version Options Community Development HeadlinePermit Center to view.
_______________________________________
PLANNING COMMISSION - Notice of Regular Meeting Schedule Change:
Beginning on January 7, 2026, the Burlington Planning Commission’s regularly scheduled meetings will be held at 5:30 PM on the first Wednesday of each month. Individual meeting notices, agendas, and meeting materials will be posted on the Community Development Department website in advance of each meeting.
_______________________________________
PLANNING COMMISSION - February 4, 2026
Item #1 - Public Meeting - Administrative Update.
Item #2 - Public Meeting - Long Range Planning Update
Item #3 - Public Meeting - Development Review Update
_______________________________________
JOINT PLANNING COMMISSION & PARKS BOARD MEETING - February 4, 2026 - CANCELED
to be rescheduled at a later date
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 1-26
- APPLICANT: John Abenroth, City of Burlington
- SITE: 200-700 block of South Pine Street, and the 700 block of East Vernon Avenue
- Comment Period Deadline: January 28, 2026
The proposed project consists of the construction of approximately 6,000 square yards of pervious concrete pavement and 1,000 square yards of pervious concrete sidewalk at three areas within the City of Burlington, WA. Construction includes pervious concrete pavement and sidewalk, drainage and water distribution improvements, sand filter layer, curbing, cement concrete curbing, driveways, and sidewalks. Click here Version OptionsCommunity DevelopmentHeadline Version OptionsCommunity DevelopmentHeadline to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 10-25
- APPLICANT: Sean Mallon, Pacland
- SITE: 487 E McCorquedale Rd, Burlington WA (P116587, P116588)
- Comment Period Deadline: January 23, 2026
The City of Burlington has received an application to develop nine self-storage buildings totaling 53,800 square feet. There will be 309 self-storage units as well as approximately 8,993 square feet of covered parking for boats, recreational vehicles and/or other vehicles. The development site is currently vacant, and the site has a total area of approximately 3.51 acres. The site is located in the regulatory floodplain. No other known critical areas are present. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. The property is located at 487 E McCorquedale Road and is identified by the Skagit County Assessor as parcel numbers P116587 & P116588. Click here Version Options Community Development Headline Version Options Community Development Headline to view.
_______________________________________
PLANNING COMMISSION - January 7, 2026
Item #1 - Public hearing on 2026 Annual Work Plan
Item #2 - Discussion: Long Range Planning Update
Item #3 - Discussion: Development Review Update
_______________________________________
Notice of Proposed Development and SEPA Public Comment Period:
- PERMIT #: LUP 9-25
- APPLICANT: P. Travis Schwetz, City of Burlington
- SITE: 133 North Norris Street (P38163) / Jason Boerner Park
- Comment Period Deadline: January 2, 2026
- Add playground improvements at Jason Boerner Park, an existing City of Burlington park facility. Improvements will include the installation of playground equipment, a restroom facility, concrete sidewalks, walking paths, covered shelter area, a full-size basketball court, and a new parking lot. The project will also include landscaping, stormwater improvements, utilities, and parking revisions for ADA access. Click here to view.
_______________________________________
PLANNING COMMISSION - December 17, 2025 - CANCELED
Agenda - materials TBD
Item #1 - Joint Planning Commission and Parks Board meeting: Public hearing on the Parks Recreation and Opens Space (PROS) Plan.
Item #2 - Planning Commission: Public hearing on the 2026 Annual Work Plan
_______________________________________
SEPA Mitigated Determination of Non-Significance (MDNS)
- PROJECT: 2026 Capital Improvement Plan (CIP) Update
- APPLICANT: City of Burlington
- Comment Period Deadline: December 10, 2025
- The City of Burlington is adopting an updated Capital Improvement Plan (CIP). The CIP is a component of the City’s comprehensive plan and includes a detailed project list and financing plan. The purpose of the CIP is to identify the capital projects needed to support growth and development for a six-year period, along with probably sources of funding. The City updates the CIP every year as part of its annual budget development process.
PLANNING COMMISSION - November 19, 2025
Item #1 - Public Meeting: 2026 Work Plan - Memo
Item #2 - Discussion: Long Range Planning Update
Item #3 - Discussion: Development Review Update
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 7-25
- APPLICANT: Johnny Phan, Quyen Phan & Thomas Sawyer
- SITE: 411 Caroline Street, Burlington WA (P72623 & P72624)
- Comment Period Deadline: November 20, 2025
The project proposes to divide a 0.44-acre lot into 2 residential lots. The property currently has a residential single-family home that will remain and a detached garage that will be demolished. No other development or site improvements are being made at this time. Click here Version Options Community Development HeadlinePermit Center to view.
_______________________________________
CUP 1-25 - HEARING EXAMINER - PUBLIC HEARING
The City of Burlington will hold a public hearing to consider an application for a Condition Use Permit (CUP 1-25). If approved, this permit would authorize the construction of a 2,821 square foot fast food restaurant with a double drive-through, outdoor and indoor dining areas. The site has an existing restaurant that will be demolished to construct the new proposed drive-through restaurant. The site is located at 1075 S Burlington Boulevard, Burlington WA (P23694). LuAron Foster, Raising Cane’s Restaurants LLC, applicant.
The City of Burlington Hearing Examiner has scheduled a public hearing at 10:00 a.m. on November 21, 2025*, in the Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA.
Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954.
*Two separate public hearings are scheduled on November 21, 2025 at 10:00 a.m. – Raising Cane’s will be the second hearing.
EXHIBITS:
0. Exhibit List
- Staff Report
- Site Plan_10-03-2025
- Landscaping Plans_10-03-2025
- Zoning Map
- Vicinity Map
- Lighting Plan
- Architecture Plans
- Trash Enclosure Details
- Traffic Report_10-03-2025
- Geotech Report
- Stormwater Report
- Flood Habitat Assessment Report
- Tree Removal Memo
- Project Narrative
- Completeness Determination
- Notice of Application
- Published Notice of Application
- SEPA Checklist_07-03-2025
- Aerial Photo for ADA Compliance
- Public Comments
- Fire Marshal Comments
- Public Hearing Notice_11-05-2025
- Public Hearing Notice_Published_11-06-2025
- Decision_Hearing Examiner_12-08-2025
_______________________________________
Notice of Permit Application/Public Comment Period and Public Hearing Notice -Preliminary Subdivision - Sharon Townhomes:
- PERMIT #: LUP 5-25
- APPLICANT: John Semrau, PE, PLS
- SITE: 204-224 East Sharon Avenue (P72722, P72723, P133618, P133619, P133620, P133621, P133622, P133623, P133624, P133625, P133626, P133627
- Comment Period Deadline: November 19, 2025
- Public Hearing Date: November 21, 2025 at 10:00 a.m.
The City of Burlington has received an application (LUP 5-25) for a preliminary subdivision development consisting of 54 lots for horizontally attached dwellings (townhomes) for individual sale. The application (CUP 3-23) for this project was originally completed on May 1, 2023, and both the land use permit and grading permit have been approved. This notice applies to the subdivision portion only. Click here Version Options Community Development HeadlinePermit Center to view.
SEPA review was previously conducted for this project, and a Mitigated Determination of Nonsignificance (MDNS) was issued on June 8, 2023. No further SEPA review is required for this subdivision.
Public Hearing Notice: The City of Burlington Hearing Examiner has scheduled a public hearing at 10:00 a.m. on November 21, 2025, in the Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA.
Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954
EXHIBITS:
0. Exhibit List - AMEND 3_11-21-2025
0. Exhibit List - Amend 2_11-20-2025
0. Exhibit List
- Staff Report
- Civil Plans - Revised
- Preliminary Plat
- Completeness Determination
- Notice of Application and Public Hearing Notice - posted, mailed to 600' list and POR
- Published Notice of Application and Public Hearing Notice
- Public Comments
8a. CUP 3-23 Staff Report - June 8, 2023
8b. CUP 3-23 Hearing Examiner Decision - August 30, 2023
9. Supplemental Memo to LUP 5-25 Recommendation - December 5, 2025
10. Supplemental Memo to LUP 5-25 - Applicant - December 29, 2025
11. "R1" Plat Correction - Scrivener's Error - June 19, 2025
12. "R2" Plat Revised Legal Descriptions - December 29, 2025
Decision - Hearing Examiner - January 15, 2026
__________________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 6-25
- APPLICANT: Anna Nelson, Landed Gentry Development, Inc.
- SITE: 920 S. Pine Street, Burlington, Washington (P72173 & P72175)
- Comment Period Deadline: November 11, 2025
- The project proposes to divide a 1.08-acre lot into 8 residential lots. The resulting residential lots will be developed into horizontally attached townhouse units for individual sale. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view
__________________________________________
PLANNING COMMISSION - October 15, 2025 has been rescheduled to October 29, 2025 at 5:30 pm
Item #1 - Capital Improvement Plan (CIP):
- Planning Commission Recommendation
- 2026 Capital Improvement Plan DRAFT - Revised from 10/15/2025
- CIP Recommendation 2026 - Parks & Rec Advisory Board
- Email - BE School District - CIP 2026
- Email - Housing Authority of Skagit County - CIP 2026
- Housing Authority of Skagit County - Capital Plan 2026
Item #2 - Active Transportation & Safety Plan DRAFT (ATS) / Transportation Element
Item #3 - Substantive Code Changes
_______________________________________
PLANNING COMMISSION - September 17, 2025 CANCELED (to be rescheduled)
_______________________________________
PLANNING COMMISSION - August 20, 2025
Item #1 - Comprehensive Plan Update:
Item #2 - Capital Improvement Plan:
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: CUP 1-25
- APPLICANT: LuAron Foster, Raising Canes Restaurants LLC
- SITE: 1075 S Burlington Boulevard (P23694)
- Comment Period Deadline: August 14, 2025
- Conditional Use Permit (CUP) for the construction of a 2,821 square-foot fast food restaurant with a double drive-through and an outdoor and an indoor dining area. The existing site currently has an existing restaurant that will be demolished to construct the new proposed drive-through restaurant. The development will involve clearing, grading, and the installation of related improvements including landscaping, parking, utilities, and storm-water improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - July 16, 2025
Item #1 - Capital Improvement Plan:
Item #2 - Comprehensive Plan Update:
- Comprehensive Plan - Vol 1
- Appendix A - Climate Policy Audit
- Climate Policy Recommendations Memo Final
- Efficiency Electrification - Procurement Revisions
- Capital Project Memo Final
- Public Facilities Services
- Goal & Policy Tracker Transportation
Item #3 - Public Participation and Engagement Project
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 4-25
- APPLICANT: Travis Schwetz, City of Burlington
- SITE: 951 S Section Str (P62744)
- Comment Period Deadline: June 26, 2025
- The project includes the construction of a new building with a total footprint of 3,000 square feet over the existing storm drain decant area. The purpose of constructing a structure over the decant area is to allow material collected from the streets by our street department to dry, which will reduce its weight and make transfer to Skagit County for final treatment more cost-effective, as disposal costs are weight-based. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - June 18, 2025
Item #1 - Comprehensive Plan Update:
Item #2 - Capital Improvement Plan:
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
__________________________________________
PLANNING COMMISSION - May 21, 2025 - CANCELED
Item #1 - Comprehensive Plan Update:
Item #2 - Capital Improvement Plan:
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
- Code Enforcement Issues - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 2-25
- APPLICANT: Don Erickson, City of Burlington
- SITE: 900 S Section Str (P23492)
- Comment Period Deadline: April 25, 2025
- The project will include the replacement of an influent and effluent pump station at the wastewater treatment plant along with two new buildings of around 400 square feet to house new electrical equipment. The site is in the regulatory floodplain but is protected by a large levee. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - April 16, 2025
Comprehensive Plan Update:
Climate Planning -
- Agenda Item #3:
- Climate Policy Audit Memo - Final
- Appendix A - Climate Policy Audit - Final
- Agenda Item #4:
- Facilities and Fleet Audit
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
- Code Enforcement Issues - discussion only
_______________________________________
CUP 2-24 - HEARING EXAMINER - PUBLIC HEARING
The City of Burlington will hold a public hearing to consider an application for a Condition Use Permit (CUP 2-24). If approved, this permit would authorize the construction of a 4,986 square foot fast food restaurant with a double drive-through, outdoor dining area, and an optional indoor playground. The development site was previously removed from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process. The proposed development will be constructed at 680 Highway 20 & 808 Nevitt Rd. The development site includes Skagit County Assessor’s parcel numbers P23672, and P23664. Steve Schwartz, Chick-Fil-A Inc.
The City of Burlington Hearing Examiner has scheduled a public hearing at 10:00 a.m. on March 28, 2025, at Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA.
Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954.
Exhibits:
0. Exhibit List
- Staff Report
- Site Plans
- Landscaping Plans
- Zoning Map
- Lighting Plans
- Trash Enclosure Details
- Building Elevations
- Geotech Report
- Completeness Determination
- Completeness Notice
- Public Notice Certification
- Email - re: Access
- SEPA Checklist
- Traffic Report
- Parking Analysis Memo
- Public Comments - WSDOT
- Public Comments - Diane Steen
- LOMA
- Public Hearing Notice - Mail-Publish-Post
- Public Hearing Notice to Parties of Record
- Public Hearing Notice Published
- Email to Parties of Record - Correction
- Supplemental Staff Report
- Traffic Report - Revised
- Changes of Approval Request_Applicant
Hearing Examiner Decision_04-30-2025
Hearing Examiner Decision_Appendix A
__________________________________________
PLANNING COMMISSION - March 19, 2025
Comprehensive Plan Update:
- Climate Planning - Presentation
- Climate Planning -
- Greenhouse Gas Emissions Inventory
- Greenhouse Gas Inventory Methods
- Vulnerable Populations Areas Infrastructure Memo
- Active/Multi-Modal Transportation Plan Update
- Burlington Goal & Policy Tracker Transportation
- Existing 2024 Intersection Level of Service
- Existing PM Peak Hour Trips
- Future 2045 Intersection Level of Service
- Future 2045 PM Peak Trips
- Climate Planning - Discussion
- Revised Public Participation Plan & Schedule
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
__________________________________________
PLANNING COMMISSION - February 19, 2025
Comprehensive Plan Update:
- Planning Commission Recommendation - Capacity Options
- Draft Plan Amendments
- Climate Planning
- Climate Risk Assessment
- Active/Multi-Modal Transportation Plan
- Revised Schedule & Public Participation Plan
Permitting & Development Update:
- Long Range Planning - discussion only
- Development Review - discussion only
__________________________________________
PLANNING COMMISSION - January 15, 2025
Annual Code Update - Minor Changes:
Permitting & Development Update:
- Current projects - discussion only
- Long Range Planning - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: CUP 2-24
- APPLICANT: Steve Schwartz, Chick-Fil-A Inc.
- SITE: 680 Highway 20 & 808 Nevitt Road (P23672, P23664)
- Comment Period Deadline: January 1, 2025
- Proposed construction of a 4,986 square foot fast food restaurant with a double drive-through, outdoor dining area, and an optional indoor playground on a 2.37 acre site. The existing site currently has a 10-room motel that will be demolished for the new proposed project. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - December 18, 2024
Annual Code Update - Minor Changes:
2025 Comprehensive Plan Update - Development Capacity Options:
- Capacity Options
- NorthStar Leadership Team Joint Statement
- Fee Waivers VOA - Ordinance 1949
- Factsheet - What is MFTE
- UGA Maps
Permitting & Development Update:
- Current projects - discussion only
- Long Range Planning - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 15-24
- APPLICANT: Madison Bowman, BYK Construction Inc
- SITE: 700 block of North Burlington Boulevard at the southwest corner of N Burlington Blvd/Hansen Place (P102587)
- Comment Period Deadline: December 18, 2024
- Proposed construction of a 4-story residential building with the ground floor being a parking garage. The development will have 96 units, 87 of the units will be studios, and the remaining 9 units will be two-bedrooms. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
APPEAL of JUDICIAL REMAND for LUP 6-23 PRELIMINARY SUBDIVISION - GAGES CROSSING
APPEAL LUP 13-24: The City of Burlington City Council will hold a closed record appeal hearing on Tuesday, November 26, 2024 at 7:00 p.m. in the City Council Chambers located at 833 S Spruce Street, Burlington WA for a Closed Record Appeal of LUP 6-23 Gages Crossing Subdivision. No public comments will be taken. Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/97859681042. Webinar ID: 978 5968 1042.
PROJECT: Development of 89 horizontally attached dwellings (townhomes) for individual sale. The development will includes street improvements to Pine Street and Sharon Avenue, landscaping, utilities, environmental mitigation, and site improvements. Proposal includes an application to remove portions of the site from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process.
APPLICANT: Landed Gentry Development Inc, Anna Nelson
APPEAL HEARING DATE: Tuesday, November 26, 2024 at 6:00 p.m. - public meeting notice
- Appeal Application_10-30-2024
- Judicial Remand_Superior Court Order_10-07-2024
- City Council Decision_05-09-2024
- Applicant's Letter_11-19-2024
__________________________________________
PLANNING COMMISSION - November 20, 2024
Annual Code Update - Minor Changes:
- Chapters 17.100 - 17.125 - DEFERRED TO FUTURE MEETING
2025 Annual Community Development Work Plan
2025 Comprehensive Plan Update - Development Capacity Analysis:
Permitting & Development Update:
- Current projects - discussion only
- Long Range Planning - discussion only
__________________________________________
PLANNING COMMISSION - October 16, 2024
Annual Code Update - Minor Changes:
- Planning Commission Recommendation
- Chapters 17.70 - 17.95
- Chapters 17.100 - 17.125 - POSTPONED
2025 Comprehensive Plan Update - Development Capacity Analysis:
2025 Capital Improvement Plan (CIP)
- 2025 Capital Improvement Plan - Final
- Planning Commission Recommendation - June 18, 2024
- Project Tracking Table
- Additional CIP Information
Permitting & Development Update:
- Current projects - discussion only
- Long Range Planning - discussion only
_______________________________________
SEPA Mitigated Determination of Non-Significance (MDNS)
- PROJECT: 2025 Capital Improvement Plan (CIP) Update
- APPLICANT: City of Burlington
- Comment Period Deadline: December 09, 2024
- The City of Burlington is adopting an updated Capital Improvement Plan (CIP). The CIP is a component of the City’s comprehensive plan and includes a detailed project list and financing plan. The purpose of the CIP is to identify the capital projects needed to support growth and development for a six-year period, along with probably sources of funding. The City updates the CIP every year as part of its annual budget development process.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 12-24
- APPLICANT: David Albert, SMR Architects
- SITE: 1724 E Rio Vista Avenue (P62688)
- Comment Period Deadline: October 4, 2024
- Volunteers of America Western Washington (VOAWW) are planning to develop the property at 1724 E Rio Vista Ave. The proposal will include 42 residential units with six (6) buildings in total. One of the buildings will include common amenities. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
- LUP 12-24 DECISION:
- Staff Report_10-10-2024
- Exhibit A - Preliminary Plans_Approved
- Exhibit B - Preliminary Plans_Marked
- Exhibit C - Sewer Comments
__________________________________________
PLANNING COMMISSION - September 18, 2024
Long Range Planning Updates:
- Planning Commission Recommendation
- Memo - Growth Allocations_Skagit County
- Final Growth Projections & Allocations
- Countywide Planning Policies
Minor Code Updates:
Permitting & Development Update - discussion only
__________________________________________
PLANNING COMMISSION - August 21, 2024
Minor Code Updates:
Long Range Planning Update:
Permitting & Development Update - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: CUP 1-24
- APPLICANT: Albert Torrico for Sage Homes NW LLC
- SITE: vicinity of NW corner of South Goldenrod Road & West McCorquedale Road (P24065, P115546, & P24062)
- Comment Period Deadline EXTENSION: September 12, 2024
- The project proposes to develop sixteen (16) 3-story apartment buildings containing 384 units, with a dedicated 1-story community building of 4,000 square feet and a future 10,000 square foot commercial development fronting South Goldenrod Road. The site consists of three parcels with a total of 20.60 acres (897,433 sf). Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 11-24
- APPLICANT: Barghausen Consulting Engineers for Costco Wholesale
- SITE: 1725 S Burlington Boulevard (P24050)
- Comment Period Deadline: August 20, 2024
- Costco Wholesale is proposing to expand the warehouse building and modify the parking areas behind the building. Approximately 8,232 square feet will be added to the warehouse for a total building area of 157,100 square feet. The project will add seven (7) parking stalls for a total of 742 parking stalls. An access off South Burlington Boulevard will be closed and a new access within the Costco property will be constructed. The proposed project will involve grading, lighting, and the installation of related landscaping. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 9-24
- APPLICANT: Albert Torrico, Sage Homes NW LLC
- SITE: 1912 & 1926 S Burlington Boulevard (P24171, P24170, P24145, P24146, P24179 and P24188)
- Comment Period Deadline: August 1, 2024
- A residential development consisting of six 3-story residential buildings for a total of 142 units and 1 existing commercial building along South Burlington Boulevard. The site is located in the regulatory floodplain and there is a wetland on the site. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - July 17, 2024
Minor Code Updates:
Population, Employment & Housing Allocations:
2025 Comprehensive Plan Update - discussion only
Permitting & Development Update:
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 8-24
- APPLICANT: Madison Bowman, BYK Construction Inc.
- SITE: 1808 S. Walnut Street (P133929)
- Comment Period Deadline: June 4, 2024
- Construct a self-storage facility that consists of 5 separate single-story buildings for a total of 67,458 square feet of semi-heated and non-heated enclosed and 750 square foot office space. The project also consists of 124,294 square feet of RV/Boat Storage that will consist of 148 spaces. The development site is currently vacant, and the site has a total area of approximately 7.25 acres. The project also includes building a private access road from Walnut Street back to the property over a 50’ easement on the North side of properties P132582 and P132581. The site is located in the regulatory floodplain. No other known critical areas are present. The proposed development will involve clearing, grading, excavation, filling, the construction of buildings, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
APPEAL of HEARING EXAMINER DECISION for LUP 6-23 PRELIMINARY SUBDIVISION - GAGES CROSSING
APPEAL LUP 6-24: The City of Burlington City Council will hold a closed record appeal hearing on Thursday, May 9, 2024 at 6:00 p.m. in the City Council Chambers located at 833 S Spruce Street, Burlington WA for a Closed Record Appeal of LUP 6-23 Gages Crossing Subdivision. No public comments will be taken. Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/97859681042. Webinar ID: 978 5968 1042.
PROJECT: Development of 89 horizontally attached dwellings (townhomes) for individual sale. The development will includes street improvements to Pine Street and Sharon Avenue, landscaping, utilities, environmental mitigation, and site improvements. Proposal includes an application to remove portions of the site from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process.
APPLICANT: Landed Gentry Development Inc, Anna Nelson
NOTICE OF REVISED DECISION:
APPEAL TO SUPERIOR COURT:
APPEAL HEARING DATE: May 9, 2024 at 6:00 p.m. - meeting notice
- Hearing Examiner Decision_02-29-2024
- Appeal Application
- Appeal Record (appendices linked below):
0. Exhibit List - revised 01-18-2024
1. Staff Report
2. Vicinity Map
3A. LOMA (floodplain) Documentation
3B. LOMA (floodplain) Documentation
3C. LOMA (floodplain) Documentation
4. Zoning and Comprehensive Plan Maps
5. Site Plan
11A. Stormwater Infiltration Feasibility Report
11B. Preliminary Stormwater Report
12.Letter from Architect and Design Details
13. Preliminary Landscaping Plan
15. Private Road Sections and Plan
17B. Conceptual Mitigation Plan
19B. Memo - Revised Wetland Report
20. Preliminary Plat
21. Pedestrian Access Improvements
23. LUP Application
24. Notice of Application - Mailed/Posted
25. Notice of Application - Published
26. Large Sign Notice - Posted
27. Title Report
28. SEPA Checklist
29. Street Design Information - Revised
31. PUD Water Availability Letter
32. Notice to Parties of Record - Staff Report Issued
33. Notice to Parties of Record - Hearing Date_Mailed
34. Notice to Parties of Record - Hearing Date_Published
36. Impact Fee Credit and Staff Report Comments
40A. Additional Comment Letters
40B. Corrections to Staff Report and Additional Exhibits
40C. Zoning Map link
41. Staff Post Hearing Memo to Hearing Examiner
42. Applicant's Post Hearing Memo to Hearing Examiner
43. Post Hearing Supplemental Information to Hearing Examiner
__________________________________________
PLANNING COMMISSION - June 20, 2024
2025 Capital Improvement Plan Update
__________________________________________
PLANNING COMMISSION - April 17, 2024
Annual Code Update:
Capital Improvement Plan:
Annual Code Update - approved by Planning Commission at March 20, 2024 meeting:
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 7-24
- APPLICANT: City of Burlington Parks Department
- SITE: 821 S Section Street (P62731)
- Comment Period Deadline: April 15, 2024
- Add playground improvements at Rotary Park, an existing City of Burlington park facility. Improvements will include the installation of inclusive playground equipment, a two-stall prefabricated restroom facility, concrete sidewalks, and benches. The project will also include landscaping, stormwater improvements, utilities, and parking revisions for ADA access. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 4-24
- APPLICANT: Karis Van Diest, Axe Engineering Services LLC
- SITE: 200 block Cascade Place (P108343)
- Comment Period Deadline: April 5, 2024
- Develop a 3-story, 26-unit apartment complex with associated parking and improvements to the existing driveway access. The development site is currently vacant and is located on Cascade Place on parcel P108343 which is 16,374 square feet (0.38 AC). The parcel is currently zoned MUC-2 which is mixed use residential and commercial. The site is located in the regulatory floodplain and is right next to Gages slough, which is a critical wetland. The proposed development will involve clearing, grading, excavation, filling, and the installation of related landscaping, stormwater, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
__________________________________________
PLANNING COMMISSION - March 20, 2024
Annual Code Update:
Capital Improvement Plan - corrections:
- East West Connector
- Fire Engine Purchase
- Hopper Interchange - East Side Expansion
- Rail Over-Undercrossing Design
- Skagit Street Signal
- SR 20 Widening - Design
- SR 20 Widening - Right of Way
Department Update - discussion only
__________________________________________
PLANNING COMMISSION - February 21, 2024
- Agenda
- Staff Memo
- Annual Code Update
- 2025 Comprehensive Plan Update
- Department Update - discussion only
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 3-24
- APPLICANT: Grandview Homes North LLC
- SITE: 199 Pease Road (P122393)
- Comment Period Deadline: February 15, 2024
- Construct a mixed-use development consisting of two buildings, A and B. Building A will be abutting the north edge of Pease Road with 67 multi-family residential dwelling units. Building A will also contain commercial retail businesses. Building B will be North of building A and will have 4 floors, each floor having 36 dwelling units. Building A has a footprint area on the order of 11,207 SF and Building B has a footprint area on the order of approximately 30,487 SF. The proposed development will include associated grading, utility, parking, landscaping, street, and sidewalk improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 1-24
- APPLICANT: Tim Woodmansee, BYK Construction Inc.
- SITE: 1700 block Port Drive (P116593)
- Comment Period Deadline: January 23, 2024
- Develop a new 100-stall parking lot. The proposed project will be a 100-parking stall lot connected with approximately 11,500 square feet of landscaping and half of the site will be paved completely to be used as a storage area. This will be an extension to the Silfab Solar building to allow for more employee and visitor parking. The development site is currently vacant and has a total area of approximately 11.36 acres and the project will be developed on 2 acres. The site is located in the regulatory floodplain. No other known critical areas are present. The proposed development will involve clearing, grading, excavation, filling, the construction of a parking lot, and the installation of related landscaping, storm-water, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
PRELIMINARY SUBDIVISION - GAGES CROSSING PUBLIC HEARING
- PERMIT #: LUP 6-23
- PROJECT: Development of 89 horizontally attached dwellings (townhomes) for individual sale. The development will includes street improvements to Pine Street and Sharon Avenue, landscaping, utilities, environmental mitigation, and site improvements. Proposal includes an application to remove portions of the site from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process.
- APPLICANT: Landed Gentry Development Inc, Anna Nelson
- Hearing Date: January 18, 2024 at 9:00 a.m. (Hearing Notice)
The City of Burlington Hearing Examiner has scheduled a public hearing at 9:00 a.m. on January 18, 2024 at Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA. Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954
Exhibits:
0. Exhibit List - revised 01-18-2024
1. Staff Report
2. Vicinity Map
3A. LOMA (floodplain) Documentation
3B. LOMA (floodplain) Documentation
3C. LOMA (floodplain) Documentation
4. Zoning and Comprehensive Plan Maps
5. Site Plan
11A. Stormwater Infiltration Feasibility Report
11B. Preliminary Stormwater Report
12.Letter from Architect and Design Details
13. Preliminary Landscaping Plan
15. Private Road Sections and Plan
17B. Conceptual Mitigation Plan
19B. Memo - Revised Wetland Report
20. Preliminary Plat
21. Pedestrian Access Improvements
23. LUP Application
24. Notice of Application - Mailed/Posted
25. Notice of Application - Published
26. Large Sign Notice - Posted
27. Title Report
28. SEPA Checklist
29. Street Design Information - Revised
31. PUD Water Availability Letter
32. Notice to Parties of Record - Staff Report Issued
33. Notice to Parties of Record - Hearing Date_Mailed
34. Notice to Parties of Record - Hearing Date_Published
36. Impact Fee Credit and Staff Report Comments
Hearing Examiner Decision_02-29-2024
_______________________________________
HEARING EXAMINER - APPEAL
- PERMIT #: LUP 4-23
- APPLICANT: Bernard Morris/Rio Vista Shops, 1724 E Rio Vista Ave (P62688)
- Hearing Date: December 12, 2023 at 3:00 p.m.
The City of Burlington Hearing Examiner will hold a public hearing on December 12, 2023, to consider an appeal of a Notice of Violation issued to Bernard Morris of Rio Vista Shops LLC. The Notice of Violation being appealed alleges Rio Vista Shops LLC is maintaining unpermitted and unsafe uses and occupancies on a property located at 1724 Rio Vista Avenue (P62688) in violation of City of Burlington building, fire, sanitation, and zoning codes.
This appeal filed by Rio Vista Shops LLC is identified by application number LUP 4-23. Pursuant to WAC 197-11-800(11) quasi-judicial appeal proceedings are categorically exempt from State Environmental Policy Act (SEPA) threshold determination requirements.
A public hearing will be held to consider the appeal filed by Rio Vista Shops LLC. The hearing will be held on December 12, 2023 at 3:00 p.m. in the City Council Chambers of the Burlington City Hall at 833 S. Spruce Street.
Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954.
Exhibits:
- Staff Report
- Skagit County URRCode
- Aerial Photos
- Documents from Previous Owner
- Annexation Ordinance – Ord 1818
- MRNB Zoning Ordinance – Ord. 1822
- Notice of Violation – May 26, 2023
- Letter Code Enforcement – February 15, 2022
- Application LUP 4-23 – June 9, 2023
- Letter of Appeal from Applicant – June 9, 2023
- Violation Notice Site Posting – May 26, 2023
- Photos of Notice of Violation Posting – May 26, 2023
- Hearing Notice Mailed to Applicant & 600 foot radius – November 27, 2023
- Email from Neighbor – 2022-2023
- Email from Neighbor – October 19, 2023
- Email to Applicant – November 30, 2023
- Hearing Examiner Decision - January 8, 2024
_______________________________________
SEPA Determination of Non-Significance (DNS)
- PROJECT: 2024 Capital Improvement Plan (CIP) Update
- APPLICANT: City of Burlington
- Comment Period Deadline: December 17, 2023
- The City of Burlington is adopting an updated Capital Improvement Plan (CIP). The CIP is a component of the City’s comprehensive plan and includes a detailed project list and financing plan. The purpose of the CIP is to identify the capital projects needed to support growth and development for a six year period, along with probably sources of funding. The City updates the CIP every year as part of its annual budget development process. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 8-23
- APPLICANT: Sound Development Group LLC
- SITE: 401, 443 & 447 Nardone Court and 615 Peterson Road (P62618, P62636, P62643)
- Comment Period Deadline: September 27, 2023
- Construct a residential development consisting of two multiunit buildings containing a total of 115 dwellings and one building containing a community room, manager’s office, and manager’s apartment. The proposed development will include associated grading, utility, parking, landscaping, street, and sidewalk improvements. Three existing buildings on the property will be demolished. The application includes a Letter of Map Amendment (LOMA) application to remove the property from the regulatory floodplain. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 6-23
- APPLICANT: Landed Gentry
- SITE: 900 block S. Pine Street (P133596, P133597, P72178, P72179, P72181, P62772 and P62771)
- Comment Period Deadline: August 16, 2023
- Development of 89 horizontally attached dwellings (townhomes) for individual sale. The development will includes street improvements to Pine Street and Sharon Avenue, landscaping, utilities, environmental mitigation, and site improvements. Proposal includes an application to remove portions of the site from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________________________
CUP 3-23: HEARING EXAMINER - PUBLIC HEARING
The City of Burlington will hold a public hearing to consider an application for a Condition Use Permit (CUP 3-23). If approved, this permit would authorize the phased development of 54 townhouse units and associated landscaping, utilities, and site improvements. Development site was previously removed from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process. The site of the proposed development is located at 204-224 East Sharon Avenue, Burlington WA. The project will involve the following parcels: P72722, P72723, P133618, P133623, P133619, P133624, P133620, P133625, P133621, P133626, P133622 and P133627. Applicant is Fifteen for Two LLC.
The City of Burlington Hearing Examiner has scheduled a public hearing at 2:00 p.m. on July 11, 2023 at Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA.
Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954
Exhibits:
0. Exhibit List
- Staff Report
- Site Plan
- Zoning Map
- Aerial - Vicinity
- Building Plans
- SEPA Checklist
- Notice of Complete Application
- Notice of Application - Posted-Mailed
- Notice of Application - REVISED Posted-Mailed
- Notice of Application - REVISED Published
- Hearing Notice - Posted-Mailed
- Hearing Notice - Published
_______________________________________
SEPA Mitigated Determination of Non-Significance (MDNS)
- PERMIT #: SEPA 1-22
- APPLICANT: City of Burlington Public Works Department
- SITE: 1150 S Skagit Street - Skagit River Park (P62806, 62840, 62843, 62841, 62844, 24231, 23531, 23535, and 24124 (may also include adjacent land owned by Skagit River Dike District without parcel numbers)
- Comment Period Deadline: June 26, 2023
- The City of Burlington is proposing to acquire an interruptible water right to irrigate
sports fields and landscaping at Skagit River Park. Water will be used to irrigate
approximately 71 acres of park land. Construction of the associated irrigation system
will involve excavation, trenching, and the installation of approximately 5,660 feet of
pipe along with associated pumps, generators, and water intakes. Two intake locations
are proposed. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 5-23
- APPLICANT: Tim Woodmansee, BYK Construction Inc.
- SITE: 1800 block S. Walnut Street (P132583)
- Comment Period Deadline: July 7, 2023
- Develop a new light industrial building. The proposed building will be one story and occupy a footprint of 12,000 square feet. The building will be used to house an electrical contractor. The development site is currently vacant and has a total area of approximately 2 acres (87,120 square feet). The site is located in the regulatory floodplain. No other known critical areas are present. The proposed development will involve clearing, grading, excavation, filling, the construction of a building, and the installation of related landscaping, storm-water, parking, and utility improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development to view.
_______________________________________________________
CUP 3-22: HEARING EXAMINER - PUBLIC HEARING
The City of Burlington will hold a public hearing to consider an application for a Conditional Use Permit (CUP 3-22). If approved, this permit would authorize the construction of a mixed-use development consisting two three-story multiunit buildings containing 24 dwelling units each and one three story mixed use building containing ten dwelling units and 1,902 square feet of ground-floor commercial space. The development will involve clearing, grading, and the installation of related improvements including landscaping, parking, utilities, and storm-water improvements. The proposed development will be constructed on two parcels located at the intersection of South Goldenrod Road and West Stevens Road. The parcels include Skagit County Assessor’s parcel numbers P23887 and P23886. Applicant is Brett Treloar of Sage Homes Northwest.
The hearing is scheduled for 1:00 p.m. on June 20, 2023 and will be held at Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA. Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954
Exhibits:
0. Exhibit List
- Staff Report
- Vicinity Map
- Zoning Map
- Notice of Application
- Comment Letter - DOE
- Comment Letter - SRSC
- Project Plans
- Revised Application Materials
- Critical Areas Report - original
- Pedestrian Connections
- Comments - Building Official
- SEPA Checklist
- LUP-CUP Application
- SEPA Record - published
- Notice of Application - mailed/posted
- Notice of Application - published
- Large Sign Certification/Photo
- Hearing Notice - mailed/posted
- Hearing Notice - published
- Complete Application
_______________________________________________________
COMPREHENSIVE PLAN UPDATE - Final Adoption
the City of Burlington will adopt a revised and updated Comprehensive Plan pursuant to the requirements of the Washington State Growth Management Act (GMA). The proposed action includes corresponding updates to the Sewer Comprehensive Plan, Surface Water Management Plan, and Capital Improvement Plan (CIP). Changes will also be made to various sections of the City’s municipal code as necessary to implement the updated comprehensive plan. Changes will be made to titles 12, 13, 14, 14A, 15, 16, and 17 of the Burlington Municipal Code.
Documents:
- Comprehensive Plan – Volume I - Plan Document
- Comprehensive Plan – Volume II – Supporting Information
- Comprehensive Plan Map
- Special Planning Areas Map
- Zoning Map
- Code Amendments
- Planning Commission Recommendation – Final Adoption of Comprehensive Plan
- Planning Commission Recommendation – Final Adoption of Code Amendments
- State Environmental Policy Act (SEPA) Checklist
- SEPA Mitigated Determination of Non-Significance
_______________________________________
Notice of Proposed Development and SEPA Public Comment Period:
- PERMIT #: SEPA 1-22
- APPLICANT: City of Burlington Public Works Department
- SITE: 1150 S Skagit Street - Skagit River Park (P62806, 62840, 62843, 62841, 62844, 24231, 23531, 23535, and 24124 (may also include adjacent land owned by Skagit River Dike District without parcel numbers)
- Comment Period Deadline: June 26, 2023
- The City of Burlington is proposing to acquire an interruptible water right to irrigate
sports fields and landscaping at Skagit River Park. Water will be used to irrigate
approximately 71 acres of park land. Construction of the associated irrigation system
will involve excavation, trenching, and the installation of approximately 5,660 feet of
pipe along with associated pumps, generators, and water intakes. Two intake locations
are proposed. Click here to view Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development .
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: CUP 3-23
- APPLICANT: Fifteen for Two, LLC - Adam Braddock
- SITE: 204 E. Sharon Avenue (P72722, P72723, P133618, and P133623)
- Comment Period Deadline: May 18, 2023
- Phased development of 54 townhouse units. Development will consist of 12 buildings containing between four and six zero-lot line/horizontally attached homes. The development will include associated landscaping, utilities, and site improvements. Development site was previously removed from the regulatory floodplain through a FEMA Letter of Map Amendment (LOMA) process. Click here to view Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development .
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 2-23
- APPLICANT: Casey Jones of U-Haul Company of South Seattle
- SITE: 650 W. McCorquedale Road (P24067, P23997, P24073, P24069, P23998, and 23986)
- Comment Period Deadline: May 5, 2023
- Develop a storage, warehousing, and equipment leasing complex consisting of three buildings at the intersection of Bouslog Road and West McCorquedale Road. The proposed buildings will have a total floor area of 171,410 square feet and the development will include associated clearing, grading, landscaping, utilities, and the construction of street frontage improvements. The property is zoned C-2 and has a total area of approximately 7.30 acres. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development to view.
_______________________________________
Notice of Permit Application and Public Comment Period:
- PERMIT #: LUP 1-23
- APPLICANT: BYK Construction Inc.
- SITE: P24006, P23959, and P23984
- Comment Period Deadline: March 9, 2023
- Construct a mixed use development consisting of one four-five story residential building containing approximately 102 dwellings and a single one story commercial building with a floor area of approximately 4,500 sq. ft. The proposed development will include associated grading, utility, parking, landscaping, street, and sidewalk improvements. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development to view.
_______________________________________
- PERMIT #: SEPA 1-23
- APPLICANT: City of Burlington
- Comment Period Deadline: April 15, 2023
- Adopt a revised and updated Comprehensive Plan pursuant to the requirements of the Washington State Growth Management Act (GMA). The proposed action includes corresponding updates to the Sewer Comprehensive Plan, Surface Water Management Plan, and Capital Improvement Plan (CIP). Changes will also be made to various sections of the City’s municipal code as necessary to implement the updated comprehensive plan. Changes will be made to titles 12, 13, 14, 14A, 15, 16, and 17 of the Burlington Municipal Code. Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development to view.
_______________________________________
- PERMIT #: SHE 1-22
- APPLICANT: City of Burlington
- Comment Period Deadline: June 7, 2022
- Proposal to conduct routine maintenance of City stormwater outfalls within Gages Slough. The proposed work will involve removing brush and accumulated sediment near 17 culverts and stormwater outfalls. Some, or all, of the proposed work will occur within regulated wetlands or wetland buffers and within the jurisdictions of the City’s Shoreline Master Program (SMP). Click here Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center /DocumentCenter/View/6904/SupplementalMemo_LUP_5-25_SharonTownhomeSubdiv_12-5-2025Permit Center Community Development Community Development Community Development to view.
_______________________________________________________
CUP 1-23: HEARING EXAMINER - PUBLIC HEARING
The City of Burlington will hold a public hearing to consider an application for a Condition Use Permit (CUP 1-23). If approved, this permit would authorize the construction of a new public street by extending East McCorquedale Road from its current terminus at South Walnut Street approximately 1,000 feet to the intersection of Burlington Boulevard and Costco Drive. The proposed development will be located in a floodplain and will result in wetland buffer impacts. The project includes associated wetland mitigation activities, landscaping, and utilities. The project extends from the intersection of South Walnut Street and East McCorquedale Road to the intersection of Burlington Boulevard and Costco Drive. The project will involve work on the following parcels: P24256, P24257, P105310, P116513, P123028, P116596, P24245, and P24246. Applicant is City of Burlington Public Works.
The City of Burlington Hearing Examiner has scheduled a public hearing at 3:00 p.m. on April 19, 2023 at Burlington City Hall Council Chambers located at 833 S. Spruce Street, Burlington WA. Additionally, the public hearing will be hosted as a Zoom Webinar, you are invited to dial-in by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 , Webinar ID: 944 9174 3954
Exhibits:
0. Exhibit List
- Staff Report
- Plans
- Zoning Map
- Notice of Application
- Complete Application
- Notice of Application - published
- Wetland Site Assessment & Buffer Mitigation Plan
- SEPA_MDNS
- Signed Development Agreement
- Recommended Changes
- Vicinity Map
- Public Hearing Notice
- Public Hearing Notice_published
_______________________________________________________
PLANNING COMMISSION - April 19, 2023
COMPREHENSIVE PLAN UPDATE
The City of Burlington Planning Commission will hold a regularly scheduled meeting on April 19, 2023 at 5:30 p.m. The meeting will be held in-person in the Burlington Council Chambers located at 833 S Spruce Street, Burlington WA.
Additionally, the Planning Commission meetings will be hosted as a Zoom Webinar, and the public is invited to dial in to listen by calling 1-253-215-8782; or online through Zoom at this link: https://zoom.us/j/94491743954 . Webinar ID: 944 9174 3954
The following items will be discussed on the Comprehensive Plan Update - agenda
1. Comprehensive Plan Update – Continuing discussion of proposed revisions to Titles 12, 13, 14, 14A, 15, and 16 of the Burlington Municipal Code to implement the Comprehensive Plan update. NOTE: after the Planning Commission agenda was published, we found that the Planning Commission had taken action on these titles on October 26, 2022.
- Planning Commission Recommendation_10-26-2-22: Titles 12, 13, 14, 14A, 15 and 16
2. Comprehensive Plan Update – Final review of proposed revisions to Title 17 of the Burlington Municipal Code to implement the Comprehensive Plan update and revised zoning map. The Planning Commission may take final action on this item.
______________________________________________________
PLANNING COMMISSION - March 15, 2023
COMPREHENSIVE PLAN UPDATE
- Agenda
- Title 12 - Street Standards
- Title 13 - Sewer
- Title 14 - Environmental Regulations
- Title 14A - Permit Processing
- Title 15 - Buildings & Construction
- Title 16 - Land Divisions
- Draft Zoning Map
_______________________________________________________
PLANNING COMMISSION - February 15, 2023
COMPREHENSIVE PLAN UPDATE
- Agenda
- Planning Commission Recommendation - Draft Comp Plan
- Draft Comp Plan - Volume I
- Draft Comp Plan - Volume II
- Draft Comp Plan Map
- Draft Special Planning Areas Map
- Planning Commission Recommendation - CIP
- Draft Capital Improvement Plan
_______________________________________________________
PLANNING COMMISSION - January 18, 2023
COMPREHENSIVE PLAN UPDATE
_______________________________________________________
PLANNING COMMISSION - October 26, 2022
COMPREHENSIVE PLAN UPDATE
- Access/Parking BMC 17.85 - Recommendation
- Exhibit A - changes to 17.85
- Exhibit B - parking requirements
- Exhibit C - private street standards
- Exhibit D - Landed Gentry letter
- Comprehensive Plan Update – Code Revisions – Changes to Titles 12 (streets), 13 (sewer), 14 (environmental regulations), 15 (buildings and construction), and 16 (land divisions) - Recommendation
- Title 12 - changes
- Chapter 13.04 - changes
- Title 14 - changes
- Title 14A - changes
- Title 15 - changes
- Title 16 - no changes
- Public Participation Plan & Final Adoption Schedule
_________________________________________________________
HEARING EXAMINER DECISIONS
- CUP 1-23 East-West Connector Street (E. McCorquedale @ S. Walnut to S. Burlington Bvld.)
- CUP 2-22 Walnut Trail Apartments/Affinity
- CUP 8-21 Drive through at 989 S. Burlington Boulevard (P23805)
- CUP 6-21 Stevens Road Apartment project
_________________________________________________________
-
Brad Johnson
Community Development Director
-
Planning Department
Physical Address
833 South Spruce St.
Burlington, WA 98233
Phone: 360-755-9717Fax: 360-755-9309